Contact Us

How India’s Largest Tile Manufacturer Unified Gate, Weighbridge and SAP

A leading tile manufacturer connected gate, weighbridge and SAP validation across 9 plants with a combined annual capacity of 87.80 million square metres.

Managing high-frequency third-party vehicle movement, the manufacturer faced challenges around:

  • Gate verification — Trucks verified manually before entry.
  • Transaction matching — Vehicle, PO/SO and weighment details checked by hand.
  • Weighment reconciliation — Weighbridge readings matched to trucks and SAP manually.
  • Dispatch validation — Outbound trucks held back by pending PO and invoice checks.

Binary Semantics deployed Logistics Process Automation (LPA) combining ANPR, Vahan/Saarthi verification, PO/SO mapping, automated weighment, direct SAP capture, and invoice validation before gate-out.

Key Results

  • 40% lower vehicle waiting time
  • 30% lower gate congestion
  • 50% less manual intervention
  • 40% faster vehicle processing
  • 100% vehicles digitally verified
  • 9 plants running one standard operating cycle

Download the case study to see how the manufacturer moved from four checkpoints to one controlled vehicle journey.

Tile manufacturer unifying gate, weighbridge and SAP across 9 plants